Skip to content

/dedicated

Capacity for the workload you know.

Brazil inventory planned for May 2027.

Contract the configuration and operating scope for steady production traffic. Bring the quantity, region, start and duration you need. We confirm capacity and terms in a written proposal.

Scope before commitment

What your quote confirms

The proposal confirms configuration, quantity, region, delivery, minimum term, costs, inclusions and operating responsibilities.

Grid operates today. Capacity in sites under development follows its own delivery and acceptance schedule.

Purchasing checklist Scope a production project

Configuration and quantity

Identify GPUs or serving models, memory, interconnect, CPU and supporting resources. State the quantity and unit. We confirm the deliverable configuration in the proposal.

Region and delivery

Tell us where the workload needs to run and when it should start. Region, residency and delivery dates are confirmed per engagement.

Term and minimum

State the duration you need. Minimum capacity, minimum billed period, start of billing, renewal and cancellation belong in the written quote.

Cost and inclusions

The proposal identifies the capacity charge and any setup, storage, network, egress, licences and support charges. It states what is included and how excess usage is billed.

Operation and acceptance

Agree model versions, concurrency, service levels, maintenance, support responsibilities and an acceptance test for the intended workload.

Private requirements

If the workload needs a specific isolation or data boundary, we scope Private alongside the capacity. Controls and residency are defined in writing.

GPU-hour metering references

Rate card v1 · September 2026 · USD

A listed rate does not reserve capacity or confirm a delivery date. Configuration, quantity, region, minimum term, billing basis and inclusions are confirmed in the quote.

View GPU-hour references

GPU-hour references

Dedicated inventory: Brazil, planned for May 2027. Configuration and quantities are confirmed in the quote.

NVIDIA L4
$0.35 / GPU-hour
NVIDIA B200
$7.08 / GPU-hour

Rate card v1 · September 2026 · USD. These are metering references for eligible GPU pools. A Dedicated quote confirms the GPU configuration, quantity, region, minimum term, billing basis and inclusions. A listed rate does not reserve capacity or confirm a delivery date.

Prepare with your team

Prepare a capacity brief.

Fill what you know. Carry these five requirements into a quote request.

Describe the configuration in your own words. The proposal confirms service, price and availability.

0 of 5 requirements drafted. Unanswered items are marked “To confirm” in the download.

Answers stay here while you explore the site during this visit. Refreshing clears them.

GPU or model, memory, interconnect and serving requirements. Describe what you need if the configuration is still open.

For example, 8 GPUs or 1 rack. Include the unit; an estimate is welcome.

Country or region, plus any residency requirement. Availability is confirmed in the proposal.

A date, month or delivery window, and whether it is flexible.

For example, 3 months or 1 year. The minimum term is agreed in the proposal.

A request is sent when you select “Send request” in the contact form. Include a process description and requirements; keep records and credentials out of the brief.

Save or reopen this brief

Continue in another visit

Save an editable brief to reopen these answers later. Files are read on this page. Submit an inquiry through the request form when you are ready.

Review deployment requirements

Request access

Grid is invite only while we scale.

Drafts stay in this browser visit. Refreshing the page clears them.

Talk to us

Tell us who you are and what you need to review.

Drafts stay in this browser visit. Refreshing the page clears them.

Each topic keeps its own requirements during this visit. Changing topic keeps your contact details.