跳至正文

本页面仅提供英文版本。在已翻译的页面上将保留您的中文语言偏好。

Purchasing checklist

Confirm model access, effective prices, capacity inclusions and acceptance before starting a Grid, Dedicated or Projects engagement.

Use this checklist to review the written scope with your technical, finance and procurement teams. Start with Pricing to choose a buying path. A submitted inquiry starts that conversation; access, capacity and delivery are confirmed separately.

Grid API access#

ConfirmRecord in the account agreement
Eligible modelsModel identifier, served version and precision, enabled capabilities and limits.
Run modeServerless or eligible Batch, request limits and the operating region.
Token ratesSeparate input, cached-input and output rates; currency, effective date and validity.
Other usageAny routing charge, credits, taxes and other chargeable services.
ActivationThe account owner, enabled access and the first verified request.

The public model prices are new-account references reviewed on 4 October 2026. Existing agreements retain their effective rates. The authenticated model list determines what the account can call. Billing explains token calculation and reconciliation.

Dedicated and Private capacity#

Prepare configuration, quantity, desired region, start and duration in the capacity brief. Brazil inventory is planned for May 2027. The quote confirms availability and the following terms.

ConfirmRecord in the capacity proposal
Deliverable configurationAccelerator and node type, memory, interconnect and supporting resources.
Quantity and locationNumber of GPUs or nodes, the billing unit, operating region and any data boundary.
CommitmentMinimum quantity, minimum duration, billed period and delivery window.
PriceSetup fee, recurring rate, currency, validity, payment schedule and tax treatment.
InclusionsStorage, networking, egress, licences, support and included model usage.
Excess and changesAdditional consumption, changes to quantity, renewal and cancellation terms.
Acceptance and operationThe acceptance test, start of billing, support responsibilities and agreed service levels.

The L4 and B200 GPU-hour references on Pricing identify metering units. Configuration and total package cost are confirmed in the capacity proposal. State whether token consumption is included or billed separately so an included service is counted once.

Projects#

Prepare the problem, volume, integrations and success criterion in the project brief. The proposal separates implementation from ongoing operation.

ConfirmRecord in the project proposal
Outcome and boundaryProduction problem, deliverables, exclusions and the responsible teams.
WorkloadExpected volume, data inputs, integrations and deployment requirements.
ImplementationDiscovery and delivery fees, milestones, dependencies and timeline.
Recurring operationOperating fees, included volume, model and capacity consumption, and excess usage.
AcceptanceEvaluation set, baseline, measurable success criterion and the person approving the result.
HandoverSupport, monitoring, change requests and responsibilities after acceptance.

Training has a separate job, training-token or capacity scope. Detection confirms its own text unit, limits and rates. Their prices are confirmed for the selected service and workload.

Procurement and follow-up#

Use Trust and deployment to prepare the required deployment boundary and document review. The evidence and procurement guide helps your team request applicable documents and record the review outcome. Confirm the applicable agreement, data-processing terms, support scope and any required approved evidence with the team before production acceptance.

After submission, keep the request reference and include it if you follow up by email. Closing a form keeps its answers and current step during this browser visit. Open the same request to continue. If a different offer, prepared brief or Grid pricing context is opened, choose whether to continue the existing draft or use the new request. Using the new request replaces the prior draft and clears its contact details. Company contact topics keep separate requirements and additional context while you switch between them. Completed confirmations remain available until you start another request. Refreshing the page clears these drafts and confirmations; they are not saved between visits. Preparing or resuming a draft does not submit it.

A submission confirmation does not reserve capacity or grant Grid access. If the form cannot confirm submission, your draft stays available for editing and retrying.

申请访问权限

Agent API 与 Grid 访问权限均实行邀请制。具体启用的服务与条款将在入驻引导期间确认。

草稿仅在本次浏览器访问期间保留。刷新页面将清空草稿。

依据我们的 隐私与数据保护声明 (GDPR、LGPD 与 CCPA)进行处理。绝不出售或共享任何个人数据。

联系我们

请告知您的基本信息和需要评估的需求内容。

草稿仅在本次浏览器访问期间保留。刷新页面将清空草稿。

在本次访问期间,每个主题都会保留各自的需求内容。切换主题不会丢失您的联系方式。

依据我们的 隐私与数据保护声明 (GDPR、LGPD 与 CCPA)进行处理。绝不出售或共享任何个人数据。

[隐私与遥测控制]

数据保护与遥测偏好设置

Forward Intelligence (国际业务由 Forlex, LLC 运营,巴西业务由 Forlex Ltda运营) 尊重您在欧盟/英国 GDPR、巴西 LGPD(Lei nº 13.709/2018)以及加利福尼亚州 CCPA/CPRA 下享有的权利。

严格必要的存储始终启用

在您的浏览器本地存储颜色主题 (grid-theme)、文档导航状态以及您的隐私偏好设置 (fwdi_privacy_consent_v1)。不会设置任何第三方 Cookie 或跨站追踪器。

语言选择器仅将您的语言偏好保存在第一方 Cookie (fwdi-language) 中,有效期最长为一年。这不会启用任何可选的分析功能。

脱敏路由与漏斗分析已禁用

收集列入白名单的营销路由上的汇总页面浏览量及粗粒度商业漏斗事件,采集工具为 @vercel/analytics。查询字符串、动态路径和个人数据在发送前均会在客户端进行脱敏处理。

阅读完整的 GDPR / LGPD / CCPA 声明